A multi-head install is a bigger day than a single. The outdoor unit is larger and heavier, so it usually sits on a level slab rather than a light bracket, with clear airflow on all sides and as far from bedroom windows as the pipe runs allow. From it, a separate insulated pipe pair, drain and cable run to each head. On a single-storey brick veneer home those runs go along the eave in a duct cover and drop into each room. On a two-storey home the upstairs heads are usually the easier ones, with runs through the wall cavity and the outdoor unit at ground level.
Drains matter more on a multi. Four heads means four condensate drains, and a drain that ends in the wrong place shows up as a damp patch on a bedroom wall. We take every drain to an outlet by gravity where we can and fit a small pump where we cannot.
Electrical. One dedicated circuit from the switchboard feeds the outdoor unit, and the heads are powered from it, so the wiring is simpler than four singles. A licensed electrician runs it and fits the isolator.
Commissioning is done head by head: pipe runs vacuumed and pressure-tested, refrigerant charge adjusted for the total run length, every head run in heating and cooling, every remote set up. Expect a full day for three or four heads, sometimes two. The office confirms the time and the price before any work, and you pay after the job.