Refrigerant recovery. Whatever gas is still in the old system is pumped into a recovery cylinder by an ARC-licensed technician before a single pipe is undone. It is never vented to the air. This is licensed work in Australia, and it is the step a cash-in-hand installer skips.
Removal. The outdoor unit comes off its bracket or slab, the indoor head comes off its wall plate, and the old pipes, drain and cable are pulled out of the wall or duct cover. If the old pipe run is corroded, kinked or the wrong size for the new unit, it is replaced. If it is sound and the same size, it can be flushed and reused, and we tell you which before the day.
Electrical. A like-for-like swap in the same spot can often reuse the existing circuit once a licensed electrician has tested it. A bigger unit, a moved unit or an old board means a new circuit, and the office prices that up front rather than on the day.
The wall. The old wall plate leaves a shadow and a row of holes. Where the new head covers them, nothing shows. Where it does not, we fill and tidy so the wall is presentable, and you see it in the finished photos.
Disposal. The old unit goes with us for recycling. Nothing is left on the nature strip.